Manufacturing

Production monitoring, batch management, and quality control

Today's Output

0

of 0 target

0% of daily target

Active Batches

3

3/6 lines running

Average Yield

97.8%

+2.3% vs last week

QC Pass Rate

100%

Above target

Active Production

5-Gallon Purified Water

In Progress

PB-2024-0118-AFilling Line Alpha

145

of 200 units

Started 08:05 AM12m downtime
73% complete

5-Gallon Spring Water

In Progress

PB-2024-0118-BFilling Line Beta

98

of 150 units

Started 08:32 AM5m downtime
65% complete

1-Gallon Purified Water

In Progress

PB-2024-0118-CFilling Line Gamma

342

of 500 units

Started 07:02 AM18m downtime
68% complete

Equipment Status

4 Operational1 Maintenance

LINE-01

Filling Line Alpha

5-Gal Purified Batch A

LINE-02

Filling Line Beta

5-Gal Spring Batch B

LINE-03

Filling Line Gamma

1-Gal Purified Batch C

LINE-04

Filling Line Delta

Maintenance

LINE-05

High-Speed Line E

Operational

LINE-06

Compact Line F

Idle

Activity Feed

45 units produced, running total: 145

Juan Rodriguez751 days ago

QC sample taken - pH Level: 7.2 (PASS)

Maria Santos751 days ago

Downtime started: Changeover - Filling nozzle adjustment

Juan Rodriguez751 days ago

Downtime ended after 12 minutes

Juan Rodriguez751 days ago

Batch PB-2024-0118-A started on Line Alpha

Juan Rodriguez751 days ago

200 empty bottles consumed from LOT-EMP-20240115

Juan Rodriguez751 days ago